Where the models have been built

Since 2009 we have modelled more than fifty water networks and worked for more than twenty utilities in Croatia, alongside long-term expert roles on World Bank, EIB and Asian Development Bank programmes abroad. Below, the projects grouped by what they were for.

50+hydraulic network models
20+utilities served in Croatia
8countries
4funding institutions: WB, EIB, ADB, EU

International water-loss programmes

Multi-year performance-based contracts where a private operator is paid for the water it saves. Hidromodel provides the hydraulic modelling, DMA and pressure-management design and the measurement campaigns behind them.

  • Addis Ababa water-loss reduction programmeAddis Ababa Water and Sewerage Authority, for Miya Water. World Bank.
    2022–2026
  • Suva–Nausori water-loss reduction and managementWater Authority of Fiji, for Miya Water. Asian Development Bank.
    2025–
  • Cetinje water supply improvementOld Royal Capital of Cetinje, Montenegro. European Investment Bank.
    2012–2015
  • National water network modellingDiam (PAEW), Oman, with Bentley Systems. Modelling and trainer role.
    2018–2019

Master plans and hydraulic models in Croatia

Thirty-year development plans built on a detailed, calibrated hydraulic model, with pre-feasibility studies, DMA and SCADA concepts and cost estimates.

  • Vodoopskrba i odvodnja ZagrebCapital-city system, master plan and detailed model
    2019–2022
  • KarlovacMaster plan and hydraulic model
    2017–2018
  • Varkom, VaraždinMaster plan and hydraulic model
    2016–2017
  • Đakovo regionMaster plan and hydraulic model
    2014–2015
  • Southern BaranjaMaster plan and hydraulic model
    2015–2016
  • Vodovod Zapadne Slavonije, Nova GradiškaMaster plan and hydraulic model
    2018–2020
  • SlunjMaster plan and hydraulic model
    2018–2019
  • Županjska PosavinaMaster plan and hydraulic model
    2019–2020
  • DrnišMaster plan and hydraulic model
    2020–2022
  • Osijek – Čepin – DaljTechnical information system and water-loss management programme
    2018–2020

DMA, pressure management and SCADA designs

Main designs ready for permitting and construction: metered zones, pressure-reducing valves and the monitoring and control systems that run them.

  • ZagrebDMA zones and SCADA main designs; replacement of spring regulators with hydraulic PRVs
  • KarlovacPressure regulation main design
  • Vodovod Zapadne SlavonijeDMA zones with pressure regulation and SCADA main design
  • DrnišDMA zones and SCADA main designs
  • NašiceMonitoring and management system main design
  • ĐakovoMonitoring and management system main design
  • OrahovicaControl system with pressure regulation, main design

EU-funded feasibility studies

Study and tender documentation for water and wastewater agglomerations applying for EU funds: hydraulic modelling, DMA and PMA concepts, demand and affordability analysis, cost-benefit analysis and investment planning.

  • Šibenik, Pirovac–Tisno–Jezera, Bibinje–SukošanFeasibility studies and tender documentation for EU funding
  • Valpovo–Belišće, Koška, Gat, PetrijevciFeasibility study and EU funding application
  • Regional water supply system OsijekFeasibility study and EU funding application
  • Pazin agglomerationField data collection, modelling and feasibility study

Water-loss action plans

Plans for whole service areas: where the water is lost, what to do first, what it costs and when it pays back.

  • Šibenik service areaWater-loss reduction action plan
  • Virovitica service areaWater-loss reduction action plan
  • Požega service areaWater-loss reduction action plan
  • Đakovo service areaWater-loss reduction action plan
  • Kutina service areaWater-loss reduction action plan
  • Vodovod Zapadne SlavonijeWater-loss reduction action plan

Technical assistance and water safety plans

Hands-on help while the plans are carried out: measurements, contractor coordination and checking that the savings are real.

  • Vodovod Zapadne SlavonijeTechnical assistance for the water-loss programme, measurement campaigns and year-round staff training
  • Belišće (Hidrobel)Water Safety Plan and analysis of the Bistrinci sewer network

GIS and digitalisation

Field surveys and GIS platforms for water utilities, and GIS consulting for large outdoor infrastructure projects.

  • OrahovicaGIS of water supply and sewer networks, development plans
  • Osijek – Čepin – DaljTechnical information system for water supply
  • Island of Pag: Kolan–Mandre–ŠimuniConceptual solutions for water-supply subsystems
  • Ohrid, Durmitor, PirotGIS for outdoor infrastructure projects, North Macedonia, Montenegro, Serbia
    2020–2022
  • Big Bear Lake (USA), Lake District (UK), Ras Al Khaimah (UAE), Toubkal (Morocco)GIS and infrastructure consulting
    2021–2023

Training

Courses and long-term professional development for utility engineers.

  • Kolektor Sisteh, SloveniaHydraulic modelling training for specialists
  • Diam (PAEW), OmanNational modelling programme and trainer role, with Bentley
    2018–2019
  • Miya Water, Addis AbabaTraining and supervision of the local hydraulic engineering team
    2022–2026
  • Croatian utilitiesWaterGEMS and GIS courses within master-plan and action-plan projects

Have a system that sounds like one of these?

A short description of the system and the problem is enough to start. We reply within two working days.

info@hidromodel.com
+385 98 269 700
31000 Osijek, Croatia